For a Zone 5A attic, sealing ceiling edges, joints and penetrations can limit moisture more effectively than adding loose vapor barrier strips.
Air sealing matters more than adding a vapor layer
A continuous air barrier is the main priority in this attic. Air leaks through a ceiling can carry far more moisture into the roof space than vapor diffusion through painted drywall. That makes careful sealing at edges and penetrations more consequential than laying loose strips of membrane in existing joist bays.
The project is in climate Zone 5A. The homeowner has finished the weather tight shell of a shed dormer, creating two new roof sections, and removed part of the second floor ceiling for the new framing. The vented sloped roof will receive closed cell spray foam; mineral wool is planned over the remaining attic floor. Contractors have offered conflicting advice about adding a vapor barrier beneath the ceiling strapping.
A smart vapor retarder could serve as the air barrier if its seams and edges are detailed continuously. Ordinary polyethylene can be a concern during long cooling periods because it may sit on the cold side of the insulation and collect moisture. How that risk will shift with future conditions in Zone 5 and colder regions is uncertain. One expert says polyethylene has not generally caused problems in Canada so far, but that experience doesn’t settle what future climates may bring.
Seal the ceiling plane at its edges
Drywall can also form the air barrier, provided installers seal the joints and gaps. At the ceiling perimeter, a bead of flexible sealant or a gasket can close the connection to the wall framing; taped and mudded joints then tie the ceiling and wall surfaces together. Seal the top plates on both sides of interior partitions as well, so air can’t travel up inside a wall and bypass the ceiling. Wires and pipes passing through top plates need sealing too, often with canned foam.
The homeowner plans to use blueboard with a plaster skim coat, and the contractor usually hangs the ceiling first. Sealing from the attic is possible with caulk or canned foam, depending on the gap, but it takes more work than sealing from indoors while the walls are installed. One contributor prefers stretchy polyurethane or similar sealants over messy acoustical caulk, and cautions against construction adhesives that cure hard. Paper tape is favored at corners because it is less likely than mesh to leave gaps or crack as an air path; mesh remains useful for flat drywall joints.
A vented attic generally doesn’t require a ceiling vapor retarder, according to one reply. The existing ceiling bays offer little benefit from unsealed strips of smart membrane. And a small space between drywall and mineral wool isn’t, by itself, the main concern: the warning was about air spaces within or above insulation.
A separate warning about the roof design
One commenter questioned whether a vented attic and fluffy insulation would work well in a cape style house with a half story. They argued that keeping warm air from escaping the second floor into a vented attic over the larger first floor can be extremely difficult, and recommended closed cell foam from soffit to ridge to bring the attic inside the conditioned space.
That concern points to the sloped ceiling as a cathedral ceiling, a distinct part of the project’s insulation plan. The commenter linked to guidance on [five cathedral ceiling approaches](https://www.greenbuildingadvisor.com/article/five-cathedral-ceilings-that-work), plus two discussions of the “devil’s triangle”: [insulating a 1940s cape](https://www.greenbuildingadvisor.com/article/qa-spotlight-how-to-insulate-a-40s-cape) and [insulating behind kneewalls](https://www.greenbuildingadvisor.com/article/insulating-behind-kneewalls). The fragment doesn’t establish whether the house has the specific cape layout described, so that broader warning should be weighed against the actual roof and attic geometry.
The replies also included a practical aside: one homeowner warned against renting a low quality insulation blower that clogs during an overnight job and is due back the next morning.