A mudroom remodel that became a foundation job
This project started with two windows and ended with a new foundation under an unheated mudroom. Paul bought two inexpensive, large, high-quality casement windows to replace a pair of single-pane double-hungs in a poorly built addition in southwest Montana. Then the job grew. Almost everything except the roof got rebuilt.
The main house is a small cedar-clapboard building from 1880, in climate zone 6. Sometime in the 1960s, someone put a 2x4-framed shed roof over a concrete patio. In the 1980s, probably, the roof was extended and a deck went in underneath. Walls were later framed under that shed roof, which created the mudroom. The slab, though, stuck out past the walls on every side. Under the roof that didn't matter much. On the driveway side, though, rain and snow hit the exposed slab and ran under the wall plate. Exploratory demolition confirmed what you'd expect.


Foundation and structure: cheap, compromised, and hard work
With essentially no budget and no option to tear everything out and start over, Paul went with a frost-protected shallow foundation wall. That meant accepting compromises. Footings were minimal, and temporary walls held up the roof for the whole process. Paul replaced the doubled 2x framing on the flat with a new double 14-inch LVL beam at the interior. His take on the old framing: he's "not sure what held this up for 60 years," and that's a fair thing to wonder about.
The schedule was rough. Paul poured one-third of the foundation just before winter, then threw his back out. He says he honestly thought he was crippled for a while. He finished the remaining two-thirds in spring. Every bit of concrete was dug, mixed, and poured bag by bag, which Paul summed up as "kinda awful." If you're weighing a hand-mixed pour on a small job, that's the real labor cost, and it doesn't show up on a materials list.


Framing, windows, and the air seal
Paul framed new 2x6 walls and sheathed them with Zip. He's happy with that choice. The premium was worth it because the building got dried in faster, though he admits "quick" is a relative term on this project. Zip LF went on the bucks around the windows and door. In hindsight, he'd tape those joints instead. Zip LF was, in his words, needlessly expensive for that job.
The sourcing is where the project gets interesting. The two casements are 3x6 aluminum-clad wood units, probably from Sierra Pacific or Kolbe. Paul got both for a hundred bucks from someone who realized mid-remodel that he couldn't reuse them. The door cost $180 from a Habitat for Humanity ReStore, and it came with a transom that Paul removed. The dog door ran $600, making it the most expensive operable component in the whole remodel. Ghost, his half-Husky, half-Samoyed, approves.
The air sealing was slow, and Paul says so. He ran Zip LF along the foundation-to-sheathing joint and added a lot of finicky blocking around the roofline, inside and out, to isolate and seal the assembly. It was time-consuming. He's glad he did it, and so should you if you're doing similar work. The roof had been unvented and stuffed with fiberglass batts. Paul's read on why it survived for decades is blunt. The assembly was so poorly built that it leaked like a sieve, and that constant wetting kept it drying out. That's not a strategy anyone should copy.



Interior insulation: the slab, the spray foam, and the installer's pitch
Paul kept the existing slab and isolated it from the exterior. The floor stack is a self-leveler, then 15-mil Stego, then 2x furring with 1.5 inches of XPS, topped with Advantech. The walls and ceiling got closed-cell spray foam (CCSF). Walls received 2 to 3 inches, and the roof "lid" got 7 inches.
Here's the part worth remembering. The installer told Paul that 4 inches would be enough, because CCSF is "magical." Paul argued, paid for the full amount, and got 7 inches. That's the right call. The roof couldn't be vented, and given the remodel's constraints, CCSF was the only practical option. Paul says he could have skipped the wall foam, but it was a cheap add when the rig was already on site.
The radiant floor is built from strips of 3/4-inch plywood, each 8 inches wide, with 15-degree bevels cut along the long edges. Paul ran 1/2-inch PEX with aluminum fins through the channels, then covered everything with more Advantech. He pressure-tested the PEX to 100 psi, and it held. Next up is hooking it to a combi boiler. Eventually, he plans to install Schluter Ditra XL under a large-format 3/4-inch limestone floor.



Walls, siding, and the finish work
Paul's custom steel wainscot is the kind of detail that makes a mudroom feel like it belongs to someone. A friend fabricated it, with welded corners and a cap. Paul coated it in Penetrol so the steel stays black over time. Behind it sits 3 inches of Rockwool Comfortboard 80 on 1x4 furring, with blocking added for lighting and outlets.


The siding took a while to get up, but the spec is clean. It's 1x6 western red cedar, actually 7/8 inch thick, in shiplap with a 4 1/8-inch exposure and a 1/8-inch gap. Paul hadn't planned to treat it. The supplier suggested a single coat of their lightest stain so the boards would weather more evenly, and Paul took the advice. He used stainless finish screws. The corners are mitered, joined with Domino connectors, glued, and screwed, with the boards bookmatched. The soffit is inexpensive 1/4-inch cedar tongue-and-groove from a big-box store, finished with one coat of shellac. It replaced painted CDX plywood that looked bad.


Where it stands, and what an expert thought
The exterior is nearly finished. Outlets and lights are the main items left out there. Paul's list for the interior is longer: stone flooring, wiring, and cabinetry, which he plans to tackle over the winter. He's cautiously optimistic. "Not THAT soon, but soon-ish," as he puts it.




Malcolm Taylor, an expert contributor, was struck by how rarely anyone shows in-progress photos of a project like this. He said the work looks great, and he noted the fairly recent metal roof. His verdict: the homeowner is all set. For anyone doing a budget remodel on an old building, the lesson is less about the finishes and more about what sits underneath them. The slab, the roof assembly, and the air seal are where the real money and effort went.