An R-65 cathedral roof in Wisconsin’s climate zone 6 raises questions about code compliance, outward drying and reliably dense-packing long truss bays.
The vent channel is only part of the problem
SteveBanks is planning a high R-value cathedral roof in northeast Wisconsin, in IECC climate zone 6. The proposed 12:12 parallel chord trusses would span 26 feet and hold dense packed cellulose, with a target of R-65. Above the insulation, the assembly would have 5/8-inch plywood sheathing, a 1½-inch ventilation channel formed by 2×4s on edge, another layer of 5/8-inch sheathing, roofing membrane and a standing seam metal roof. Inside, the plan calls for a gypsum ceiling with Class II vapor-retarder paint, a 1½-inch service cavity and a second gypsum layer.
The steep roof is meant to make room for second-floor bedrooms and help snow slide off the photovoltaic panels. Steve’s concern is that conventional ventilation baffles may block outward drying if indoor moisture reaches the cellulose. The replies point to a bigger question: whether the proposed assembly is allowed in this climate zone, and how reliably its deep truss bays can be insulated.
Material choice and code need attention
One reply says building codes prohibit permeable insulation directly beneath roof sheathing in this climate zone. Malcolm Taylor suggests replacing the lower roof sheathing with housewrap, which would let the assembly dry toward the vent channel while reducing material and cost. He links to [Fine Homebuilding’s roof assembly article](https://www.finehomebuilding.com/2021/04/28/a-new-take-on-insulating-a-roof) and [Green Building Advisor’s article on a vaulted, foam-free roof](https://www.greenbuildingadvisor.com/article/building-a-vaulted-high-performance-and-foam-free-roof-assembly).
Other contributors recommend vapor-open baffles, such as ¼-inch waferboard, or site-built channels. Bill Wichers says conventional baffles may still allow some drying through imperfect joints and framing, provided only a small amount of moisture enters the assembly. Michael Maines adds a caution: plywood and other sheet goods can slow vapor movement. He has built a related system using 7/16-inch ZIP sheathing on the interior, 12-inch cellulose-filled bays and 5/8-inch ZIP sheathing outside, but says roofers objected to the diagonal 2×4 furring used without another sheathing layer.
Maines says the approach can work, and that the IRC requires wall sheathing to be fastened directly to framing. Malcolm Taylor recalls seeing a view that a related design was code-compliant but considered too risky; he couldn’t find the discussion again and planned to ask Randy for more input. The exchange leaves some uncertainty around how a particular assembly will be interpreted, so the code question deserves a project-specific answer before construction.
Filling long bays from the eaves is a gamble
The commenters are skeptical that an installer could dense-pack these long truss cavities from the eaves alone. Peter Engle says blown insulation generally requires access at multiple points before drywall goes up. If trusses are more than 16 inches on center, he warns, insulation netting may sag enough to complicate drywall installation. Cross strapping can support the netting and create a shallow electrical chase that reduces ceiling penetrations.
Wichers suggests considering Spider, a sticky fiberglass insulation that can be applied to open ceilings before drywall installation. Maines says filling long, deep bays from one end is possible with enough experience and testing, but he wouldn’t count on most installers to do it consistently. His usual approach is to install full Insulweb membrane for the blown insulation, then add airtight layers.
Randy Williams points to [Insulair](https://advancedbuildingproducts.com/product/insulair/), a product designed to create a space above closed-cell spray foam at the roof deck. He thinks it might suit dense-packed cellulose too, but recommends checking with the manufacturer.
A small attic could simplify the design
Akos proposes framing a shallow attic near the ridge, using collar ties between the truss legs. The space could be accessed through a larger gable vent, filled with loose insulation, and topped up after settling. Permeable baffles would still be needed, but loose fill would put less pressure on the baffles and ceiling and could avoid the challenge of dense-packing the long truss bays. Taylor adds that a small flat area can also sidestep complications at the ridge beam.
The practical takeaway is that the over-roof concept has several possible paths, but the insulation method and drying details matter as much as the nominal R-value. Steve also asked whether crews could avoid cutting and patching the gypsum air barrier by blowing cellulose from the eaves. The replies suggest that this is unlikely to be a dependable plan for bays of this size.
Discussion links and images


GBA Detail Library — a collection of one thousand construction details organized by climate and house part.

Related discussions:
- [Open roof with single sloped parallel trusses](https://www.greenbuildingadvisor.com/question/open-roof-with-single-sloped-parallel-trusses)
- [Venting (or not) and insulating a 6:12 parallel chord truss roof](https://www.greenbuildingadvisor.com/question/venting-or-not-and-insulting-612-parallel-chord-truss-roof)
- [Vented over-roof on parallel chord truss](https://www.greenbuildingadvisor.com/question/vented-over-roof-on-parallel-chord-truss)
- [How to insulate parallel chord roof trusses?](https://www.greenbuildingadvisor.com/question/how-to-insulate-parallel-chord-roof-trusses)








Steve posted the question on October 12, 2026, in General Questions. Replies from Bill Wichers, Peter Engle, Malcolm Taylor, freyr_design, Michael Maines, Randy Williams and Akos followed that day. Steve thanked the contributors.